Skip Navigation LinksCBE HomeSchoolsBuilding & Modernizing SchoolsSchool Maintenance & Renewal

Building & Modernizing Schools

Building & Modernizing Schools School Maintenance & Renewal

School Maintenance & Renewal

Each year the Province announces funding levels under its Maintenance & Renewal P​rograms made available to the CBE for the primary purpose of investing in the repair and replacement of major facility components.

The pr​​ovincial School Capital Manual outlines that school jurisdictions must utilize Maintenance & Renewal funding to:

  • ensure school facilities meet all regulatory requirements, particularly as they pertain to providing a safe and healthy learning environment;
  • preserve and improve the quality of the learning environment by:
    • replacing building components that have failed;
    • prolonging the life of the school facility through planned, proactive replacement of major components; and
    • upgrading of the educational areas to meet programming requirements.
  • meet the facility requirements of students with special needs; and
  • replace or upgrade building components to improve energy conservation and efficiency and to achieve cost savings as a result.
Funding from the Maintenance & Renewal programs is NOT to be used for major capital projects, including the addition of permanent or modular school space.

There are currently two Maintenance & Renewal programs available to school authorities:
  • Infrastructure maintenance and renewal: provided based on the school year (September 1 to August 31), which is allocated to school jurisdictions on a formula basis. Infrastructure maintenance and renewal projects must meet the above criteria and the expenditures may be capitalized or expensed; and
  • Capital maintenance and renewal: provided based on the Government of Alberta fiscal year (April 1 to March 31) and is project specific but still allocated on a formula basis. Besides meeting the above criteria, Capital maintenance and renewal projects must be capitalized and cannot be expensed.​​

​​

 
Last modified: 5/27/2025 3:53 PM
Website feedback: Webmaster
^